September 2026
14.09.2026
Building 1:
Section 1.1
- Work is underway on installing heating pipes and wall plastering
- Installation of the section roof and window structures is nearing completion
Section 1.2-1.3
• Monolithic frame construction is in progress
Section 1.6-1.7
- Construction of the monolithic frame has begun
Section 2.1
- Piling work - 100% complete